Skip to main content
Monday, November 16, 2026Nov 16

TVA building landfill to handle remaining ash from spill

photo Heavy equipment operators continue work on a containment wall at the Tennessee Valley Authority ash spill recovery site in Kingston, Tenn., last week.
Enthusiasts of the books series 'The Hunger Games' came out in bunches to the premiere of the first movie in the saga. Close to a thousand fans showed up at the Rave Theater off Colonel Glenn Road for the first two showings at 12:01 and 12:31 a.m. early Friday morning.

Fans flock to premiere of 'The Hunger Games'

Video available Watch Video

HARRIMAN, Tenn. – Streets of empty houses sit with dark windows around the glittering coves of the Emory River.

A glance away, giant earth-moving machines scoop, pull and push ash, the unwelcome trespasser that nearly three years ago belched from a failed landfill to ooze over 300 acres and the river. As the machines reshape the muck, massive tankers continually sprinkle water to keep dangerous silica floaters out of the air and out of people’s lungs.

One by one, more than 180 homeowners packed up and left, saying they had come to fear that even if they survived health threats they could barely pronounce, their land values and financial futures could not.

“We have to be out by mid-January,” said Gary Topmiller, whose two-story brick house sits on a cul-de-sac with the-once picturesque river wrapping around it.

Now his view is the gray horizon of a disaster cleanup.